4 points, 0 comments on Hacker News
Source: [Hacker News](https://www.aftenposten.no/amagasinet/i/8paE91/utbygging-av-datasentre-i-norge-manglende-overtidsbetaling-og-svaert-lange-arbeidsdager)
Russia and Ukraine both report cyberattacks on their alerting systems, as strikes continue across the countries.
1 points, 0 comments on Hacker News
1 points, 0 comments on Hacker News
1 points, 0 comments on Hacker News
1 points, 0 comments on Hacker News
I got tired of getting served strange and weird ads due to the fact that our TVs monitor just about everything we do. So I built an HDMI man in the middle to detect ads and replace them. Presented the concept and launched the open source repo this year at HOPE 2026, huge thanks for the conferen...